Skip to content
ORIEL
A facade of squares and lines, the openings set on a strict structural grid.

№ 008 · mixed-use · completed

Foundry Yard

Bermondsey · SE1 · Workplace and retail · Completed 2022

Use
Workplace and retail
Area
46,000 sq ft
Storeys
4
Tenure
freehold
Schedule
Completed 2022
Architect
Ostend Studio
Price
On application

The Brief

A four-storey workplace over ground floor retail, planned around a courtyard that is open to the street.

The yard was the point. The site had a working courtyard at its centre for a hundred and twenty years, and the scheme keeps it open to the street rather than enclosing it as an atrium. That loses lettable area on every floor and gives the building a public room, which was the trade the planning consent was granted on.

Retail wraps the ground floor on two sides of the yard. The workplace floors sit above on a strict structural grid, and the facade is a single repeated panel — a decision made to keep the cost down that turned out to be the best thing about the building.

It has been fully let since the month it completed, and two of the original tenants have since taken additional space. We take that as the only review of a workplace building that means anything, and certainly as more useful than the one it got in the architectural press.

Section

The building as it stacks — 4 levels over 4 storeys. Every level is listed beneath, so the arrangement reads whether or not the model loads.

Ground Floor4.6M · 4 ROOMSFirst Floor3.6M · 3 ROOMSSecond Floor3.6M · 3 ROOMSThird Floor3.6M · 3 ROOMS15.4M

4 levels · 4 storeys · Section drawing

  1. Third Floor

    3.6m · 28×20m

    Open Floor · Core · Terrace

  2. Second Floor

    3.6m · 32×22m

    Open Floor · Core · Walkway

  3. First Floor

    3.6m · 32×22m

    Open Floor · Core · Walkway

  4. Ground Floor

    4.6m · 32×24m

    Yard · Retail East · Retail South · Reception

Gallery

A concrete complex of stacked volumes stepping across the site.A perforated canopy abstracted to pattern, daylight breaking through in points.Angular metal cladding meeting at a sharp external corner.A close view of a patterned facade panel, the relief cut shallow and repeated.A faceted ceiling in warm metal, its panels folding into shallow pyramids.

Image 1 of 5

Ricardo Gomez Angel

Materials

  • 01

    Precast panel

    One repeated unit across every elevation.

  • 02

    Engineering brick

    Courtyard paving and the base course, laid to fall.

  • 03

    Galvanised steel

    Yard stair and walkways, left unpainted.

  • 04

    Exposed concrete

    Frame and soffits throughout the workplace floors.

District

Bermondsey

SE1

Warehouses, yards and railway arches, at the point where the industry turned into something else.

Bermondsey was a working riverside for three centuries and the pattern of that work is still the pattern of the streets: long thin plots running back from the water, yards behind, arches carrying the railway straight through the middle of it. The grain is small and the surviving fabric is robust.

More on Bermondsey

Availability

Fully let. Enquiries welcome for future availability.

Status · COMPLETED

Schedule · Completed 2022

Price · On application