A workplace building in pale concrete and glass, its structure expressed on the elevation.

№ 006 · commercial · completed

Gantry Works

King's Cross · N1C · Workplace · Completed 2024

Use
Workplace
Area
84,000 sq ft
Storeys
6
Tenure
freehold
Schedule
Completed 2024
Architect
Hollis Brandt
Price
On application

The Brief

Eighty-four thousand square feet of workplace on an exposed frame, with floor plates clear of columns for eighteen metres.

The brief was floor plates that could be planned any way a tenant wanted for the next forty years, which meant getting the columns out of the way. The frame spans eighteen metres from the perimeter to a single central core, so every floor is a clear field with structure only at its edges.

That span is expensive and it is the whole building. It dictated the depth of the beams, which dictated the floor-to-floor height, which dictated a six-storey building on a site that could have taken seven. We took the storey out rather than lose the span.

Servicing runs in a raised floor rather than a dropped ceiling, so the soffit is left exposed — a flat concrete plane, three metres two above the finished floor, with nothing suspended from it.

Section

The building as it stacks — 4 levels over 6 storeys. Every level is listed beneath, so the arrangement reads whether or not the model loads.

Ground Floor5.2M · 4 ROOMSLower Office Floors4.0M · 3 ROOMSUpper Office Floors4.0M · 2 ROOMSRoof2.0M · 2 ROOMS15.2M

4 levels · 6 storeys · Section drawing

  1. Roof

    2.0m · 36×22m

    Plant · Terrace

  2. Upper Office Floors

    4.0m · 36×22m

    Open Floor · Core

  3. Lower Office Floors

    4.0m · 40×22m

    Open Floor · Core · Terrace

  4. Ground Floor

    5.2m · 40×22m

    Reception · Café · Cycle Store · Changing

Gallery

A single desk against a plain wall in a quiet corner of a workplace floor.An open workplace floor lit from a full-height glazed wall.A dark curved atrium, its wall turning continuously around the void.Tapered columns opening into the soffit above a glazed ground floor.A ribbed soffit curving down to meet the wall below.

Image 1 of 5

Mahmoud Azmy

Materials

  • 01

    Exposed concrete soffit

    No suspended ceiling anywhere in the building.

  • 02

    Structural steel

    Eighteen-metre perimeter-to-core span, expressed on the elevation.

  • 03

    Anodised aluminium

    Curtain wall in a single dark tone.

  • 04

    Terrazzo

    Ground floor and stair cores, ground and sealed in situ.

District

King's Cross

N1C

Sixty-seven acres of railway land, rebuilt over twenty years into the most tested piece of new city in Britain.

What makes King’s Cross work is not any single building but the fact that the streets were laid before the plots were sold. The public realm came first, the buildings were fitted into it afterwards, and the result is a district that behaves like a piece of London rather than an estate with a masterplan drawn around it.

More on King's Cross

Availability

Two floors available to let. Enquiries to the studio.

Status · COMPLETED

Schedule · Completed 2024

Price · On application