Skip to content
ORIEL
New apartment buildings under construction, their frames topped out against grey sky.

№ 005 · residential · launching

Verge

King's Cross · N1C · 26 apartments · Completing 2027

Use
26 apartments
Bedrooms
2
Bathrooms
2
Units
26
Area
1,010 sq ft
Storeys
11
Tenure
leasehold
Schedule
Completing 2027
Architect
Sable Ling
Price
From £1,180,000

The Brief

Twenty-six apartments behind a folded metal facade, currently topping out beside the goods yard.

The site sits on the edge of the goods yard, facing a railway cutting on its long side. A cutting is a difficult neighbour — noise, and a view that changes every ninety seconds — so the facade is folded rather than flat, angling each window away from the tracks and toward the open sky above them.

The folds are structural rather than applied. Each bay is a precast unit whose faces are cast at fifteen degrees, which stiffens the panel enough to span floor to floor without a secondary frame behind it. The consequence is a facade only 180 millimetres thick that reads as deep relief.

The frame topped out in June. Cladding starts on the north elevation this quarter, and the first apartments are released in spring.

Section

The building as it stacks — 4 levels over 11 storeys. Every level is listed beneath, so the arrangement reads whether or not the model loads.

Ground Floor4.4M · 3 ROOMSLower Floors2.9M · 2 ROOMSMid Floors2.9M · 2 ROOMSUpper Floors3.1M · 3 ROOMS13.3M

4 levels · 11 storeys · Section drawing

  1. Upper Floors

    3.1m · 16×13m

    Two Apartments · Terrace · Core

  2. Mid Floors

    2.9m · 20×14m

    Three Apartments · Core

  3. Lower Floors

    2.9m · 22×14m

    Three Apartments · Core

  4. Ground Floor

    4.4m · 22×15m

    Entrance · Commercial Unit · Cycle Store

Gallery

Steel framework standing exposed before the cladding is hung.Tower cranes over a construction site in first light.A folded facade whose planes catch light at different angles across the elevation.A perforated metal facade reading as a fine grid at distance.A card massing model of the scheme standing on a plain surface.

Image 1 of 5

Jacek Dylag

Materials

  • 01

    Precast concrete

    Folded bay units, faces cast at fifteen degrees.

  • 02

    Perforated aluminium

    Balcony screens toward the cutting.

  • 03

    Engineered oak

    Flooring throughout, laid on an acoustic deck.

  • 04

    Blackened steel

    Balustrades and entrance screens.

District

King's Cross

N1C

Sixty-seven acres of railway land, rebuilt over twenty years into the most tested piece of new city in Britain.

What makes King’s Cross work is not any single building but the fact that the streets were laid before the plots were sold. The public realm came first, the buildings were fitted into it afterwards, and the result is a district that behaves like a piece of London rather than an estate with a masterplan drawn around it.

More on King's Cross

Availability

Launching spring 2027. Register for the first release.

Status · LAUNCHING

Schedule · Completing 2027

Price · From £1,180,000